EPC Contractors
Designed for Engineering. Planned for Site Execution.
For EPC contractors, equipment selection affects more than the purchase schedule. Substation space, civil foundations, protection coordination, cable terminations, interfaces and test documentation must be considered early. C-SEC's product and engineering information is organised to support informed project planning.
01
Project coordination points
- 01Tender compliance
- 02drawings and technical schedules
- 03substation layout
- 04project milestones
- 05FAT participation
- 06dispatch and handling
- 07site installation interfaces
- 08testing and commissioning scope
02
Equipment pathways
AIS for appropriate primary distribution lineups; RMUs for secondary distribution points; packaged substations where integrated enclosure-based delivery suits project requirements.
03
Documents EPC teams ask for
Product technical datasheet, compliance/deviation statement, GA/foundation, SLD/interface drawings, inspection and test plan, QA/test evidence, installation guideline, shipment dimensions and service documentation.
04
How to send an RFQ
Upload the electrical SLD, electrical schedule, specification, site location, required delivery date and inquiry contact. Identify optional requirements separately to speed clarification.
Product pathways
Equipment categories evaluated for this application
Suitability is confirmed per project from the SLD, ratings and site conditions — not implied by category.
CSA 12 / CSA 12 N12 kV · 17.5 kV
12 kV AIS
View technical details →
CSA 2424 kV
24 kV AIS
View technical details →
CSA 3636 kV
36 kV AIS
View technical details →
CSS33 kV · 36 kV
33 kV Outdoor VCB Kiosk
View technical details →
CSG I12 kV · 24 kV
Indoor SF6 RMU
View technical details →
CSG IK12 kV · 17.5 kV
Indoor/Outdoor SF6 RMU
View technical details →
CSG O12 kV · 17.5 kV
Outdoor SF6 RMU
View technical details →
- 33 kV
33 kV
33 kV RMU
View technical details →
PSS-CS series12 kV · 24 kV
Packaged Substations
View technical details →
Questions
Yes, use the project-enquiry route and attach relevant documents for review.
The website should always identify approved revisions, while project transmittals retain their formal contractual controls.