Designed for Engineering. Planned for Site Execution.

For EPC contractors, equipment selection affects more than the purchase schedule. Substation space, civil foundations, protection coordination, cable terminations, interfaces and test documentation must be considered early. C-SEC's product and engineering information is organised to support informed project planning.

01

Project coordination points

  • 01Tender compliance
  • 02drawings and technical schedules
  • 03substation layout
  • 04project milestones
  • 05FAT participation
  • 06dispatch and handling
  • 07site installation interfaces
  • 08testing and commissioning scope

02

Equipment pathways

AIS for appropriate primary distribution lineups; RMUs for secondary distribution points; packaged substations where integrated enclosure-based delivery suits project requirements.

03

Documents EPC teams ask for

Product technical datasheet, compliance/deviation statement, GA/foundation, SLD/interface drawings, inspection and test plan, QA/test evidence, installation guideline, shipment dimensions and service documentation.

04

How to send an RFQ

Upload the electrical SLD, electrical schedule, specification, site location, required delivery date and inquiry contact. Identify optional requirements separately to speed clarification.

Questions

Yes, use the project-enquiry route and attach relevant documents for review.

The website should always identify approved revisions, while project transmittals retain their formal contractual controls.

Need help selecting?

Share your SLD, schedule or specification. An engineer will review the next technical step.