
Renewables & EV Infrastructure
MV Interfaces for Emerging Energy Infrastructure
Renewable generation and high-capacity charging infrastructure create new demands on distribution systems. Medium-voltage equipment selection is part of a wider engineering process covering grid interface requirements, fault levels, protection coordination, earthing, metering and control.
01
Typical considerations
- 01Import/export electrical profile
- 02grid-code and utility interface
- 03protection coordination
- 04cable routing
- 05remote monitoring
- 06expected future network changes
- 07equipment environmental location
02
Relevant products
Depending on the utility-approved network design, C-SEC's AIS, RMU and packaged substation categories can be evaluated for appropriate project roles. Do not imply certification for a specific renewable technology without evidence.
03
Application-specific technical review
Solar and wind projects can involve generation export and specialist protection interfaces; EV charging hubs may present concentrated and changing demand profiles. Both should be evaluated by qualified electrical designers.
04
Documents
Project SLD / electrical study / utility approvals / target site layout / required equipment function / protection and communications schedule.
Product pathways
Equipment categories evaluated for this application
Suitability is confirmed per project from the SLD, ratings and site conditions — not implied by category.
CSA 12 / CSA 12 N12 kV · 17.5 kV
12 kV AIS
View technical details →
CSA 2424 kV
24 kV AIS
View technical details →
CSA 3636 kV
36 kV AIS
View technical details →
CSS33 kV · 36 kV
33 kV Outdoor VCB Kiosk
View technical details →
CSG I12 kV · 24 kV
Indoor SF6 RMU
View technical details →
PSS-CS series12 kV · 24 kV
Packaged Substations
View technical details →
Need help selecting?
